Management components
SCM components are the third element of the four-square circulation framework. The level of integration and management of a business process link is a function of the number and level of components added to the link (Ellram and Cooper, 1990; Houlihan, 1985). Consequently, adding more management components or increasing the level of each component can increase the level of integration of the business process link.Literature on business process re-engineering buyer-supplier relationships, and SCM suggests various possible components that should receive managerial attention when managing supply relationships. Lambert and Cooper (2000) identified the following components:
- Planning and control
- Work structure
- Organization structure
- Product flow facility structure
- Information flow facility structure
- Management methods
- Power and leadership structure
- Risk and reward structure
- Culture and attitude
Consequently, Lambert and Cooper's framework of supply chain components does not lead to any conclusion about what are the primary- or secondary-level (specialized) supply chain components (see Bowersox and Closs, 1996, p. 93) —that is, which supply chain components should be viewed as primary or secondary, how these components should be structured in order to achieve a more comprehensive supply chain structure, and how to examine the supply chain as an integrative one